top of page
Long Lake Hydro Transmission Line
Since 2020, Sirgo has been the trusted provider of inspection and maintenance services for the Long Lake alpine transmission line near Stewart BC and Hyder Alaska. Our comprehensive offerings include rope access structural and torque inspections, as well as foundation post-tensioning.
Accessed via helicopter, this project is situated in a remote and often challenging environment characterized by hostile weather conditions. Despite these obstacles, our dedicated team ensures the reliability and longevity of the transmission line infrastructure.
For inquiries about our specialized inspection and maintenance services, contact us today.
bottom of page